Scandoil  

Add Energy Scoops Maintenance Build Contract with BP KLPG


Published Jan 11, 2017
[an error occurred while processing this directive]

Edit page New page Hide edit links

Add Energy - Adam - Murray-2
From left, Add Energy Executive Vice President, Peter Adam and Engineering Manager, Stuart Murray (Add Energy)

Add Energy, the international oil and gas upstream consultancy provider, has been awarded a contract worth GBP 200,000 for work on BP’s Kinneil Liquid Petroleum Gas (KLPG) Chilldown Project located at its Refrigerated Liquid Petroleum Gas (RLPG) site in Grangemouth.

The contract will see Add Energy carry out the provision of a full maintenance build for the new KLPG plant. The scope of work includes an asset register validation and technical hierarchy build, equipment criticality assignments, development of maintenance strategies, procedures and job plans and a critical spares optimisation and bill of materials (BOM) development.

Peter Adam, Executive Vice President, Add Energy comments, “We are delighted to have been selected for this project by BP. As maintenance and reliability specialists, we have access to a team of 50 people who are subject matter experts in their own discipline. We have built a global library of maintenance strategies based on best practice and reliability data, which combined with lessons learnt from previous maintenance build contracts will support and enhance this project. Add Energy is focused on supporting operators in getting best value for money and will continue to optimise maintenance expenditure for BP.”

The RLPG plant at Grangemouth currently operates with R22, a colourless, refrigerant gas. EU legislation requires the replacement of R22 and R410a has been identified as a suitable more environmentally friendly and efficient alternative. Refrigeration is required to chill the Liquefied Petroleum Gas (LPG) to enable storage and eventual transportation by ship to market. Without refrigeration, the Forties Pipeline System would be unable to operate.

Hook-up and commissioning of the plant is now well under way with the plant expected to be operational later this year.

Tags: add energy, BP




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml