Abilene Oil and Gas Limited says that drilling of the next well at the Central Kansas Uplift Project has commenced as advised by the joint venture operator CMX Inc.
CKU Project: Bushton #1-36 well
CMX has advised that the rig has moved to the Bushton #1-36, located in the Ellsworth County, and that drilling has commenced.
The well is to be drilled to a Total Depth (TD) of 3400 feet and is expected to take approximately 7 days.
Tags:
Abilene Oil and Gas
Comments on this page are closed.