Scandoil  

2H Offshore delivers Lightweight Conductor Supported Tripod Platform design for Dubai Petroleum


Published Feb 12, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

2H Offshore - Fateh field

2H Offshore, an Acteon company, was appointed by Dubai Petroleum (DP) to deliver an intensive, fast track design of an ultra-lightweight conductor supported tripod platform.

The tripod platform, known as T-02, has been successfully installed in the Fateh field, offshore Dubai in 50m water depth. The platform consists of a minimal topside and subsea structure and hosts an exploration well during an upcoming drilling and well test campaign.

As part of the T-02 platform project, 2H Offshore investigated a wide range of development options to facilitate the exploration well for DP before ultimately proving the conductor supported tripod as the most economical and technically feasible solution.

The tripod is designed for installation from a jack-up drilling rig, enabling drilling to commence directly after installation. Leading the detailed design, 2H Offshore undertook the structural design of the subsea template, conductors and topside brace structure while liaising with DP on the access platform and other structural details.

Tags: 2H Offshore Inc.




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml