Tlou Energy Limited has commenced gas production testing from the Selemo 1 pilot well, located at its 100% owned Lesedi CBM Project.
The aim of the gas testing program is to provide evidence of a sustainable gas production rate achievable from the field and develop the first wells flowing commercial rates of gas in Botswana.
Tags:
Tlou Energy Limited
Comments on this page are closed.