Scandoil  

Oilex continues to produce gas from Cambay-73 well


Published Aug 26, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex - Cambay field

Oilex says that Cambay-73 well continues to produce gas for the low pressure market in the immediate vicinity of the field at ~26 boepd with 100% availability. A temporary pipeline from Cambay-77H site to Cambay-73 production facility has been completed as part of a gas gathering system to assist in meeting market demand. Three legacy wells have been connected to this pipeline and provide additional gas to the low pressure market via the Cambay-73 production facility.

In addition, subsequent to the installation of a production tree and production tubing, Cambay-77H will be connected to the temporary pipeline to service the low pressure market via Cambay-73, without having to construct a dedicated low pressure production facility at the Cambay-77H site. It is estimated this will result in a saving of ~US$150K after eventually replacing the temporary pipeline with a permanent pipeline during 2016.

Preparation of the 5 well workover campaign is nearing completion and field work is anticipated to commence during September 2015. The workover campaign is targeting both oil and gas production which will make a contribution to generating operating cashflow to assist in the Indian operations becoming cashflow positive.

Tags: Oilex Ltd




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml