Scandoil  

Comet Ridge restarts production at Mahalo 6 well


Published Aug 7, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Comet Ridge Limited

Comet Ridge Limited wishes to provide an operational update on the progress of the Mahalo 7 horizontal surface to in-seam well project.

As previously announced, a workover of the Mahalo 6 vertical intercept well, to replace the downhole pump, was scheduled for commencement in late July 2015. Comet Ridge is pleased to advise that the workover was completed on 31 July 2015 with no technical issues or concerns.

Allowing for the time required to reinstall pipework and instrumentation, APLNG, as Production Operator restarted the Mahalo 6 pump late yesterday. The pump will be run at a slow speed initially to allow for a slow drawdown of reservoir pressure and will be gradually ramped up based on well productivity assessment.

Tags: Comet Ridge Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml