Scandoil  

Comet Ridge provides an update on Mahalo Pilot schemes


Published May 30, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Comet Ridge Limited

Comet Ridge Limited provide an operational update for the Mahalo and Mira Pilot Schemes within the ATP 337P Mahalo Block, located approximately 240 km west of Gladstone in Central Queensland. Comet Ridge currently holds a 35% equity interest in the block, which will increase to 40% following completion of the conditions under the Deed of Option with Stanwell announced on 19 March 2014.

Mahalo Pilot Scheme

Following the completion of the under-reaming and jet wash stimulation on the Mahalo 3 and Mahalo 5 wells in January and February, the Mahalo Pilot wells have been continuously dewatering for most of the past three months. Mahalo 6 is being used as a pressure observation well, whilst the Mahalo 3, 4 and 5 wells are being pumped to produce water, allowing the reservoir pressure to be reduced which in turn allows gas to flow. The JV has adopted a strategy of intentionally dewatering slowly to protect the coal reservoirs.

Tags: Comet Ridge Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml