With LNG becoming increasingly viable and popular as a marine fuel, Wärtsilä continues to develop technical solutions that facilitate this trend. The latest Wärtsilä developments in this field involve an upgraded version of the Wärtsilä LNGPac, a fully integrated fuel gas handling system, and improvements to the coveted Wärtsilä Gas Valve Unit (GVU).
Wärtsilä introduced the LNGPac in 2010. It comprises a complete system for LNG fuel handling, which when introduced included the bunkering station, the LNG tank and Tank Connection Space with the required process equipment, the heating media skid, and the control and monitoring system.
It is a unique system that has proven to be a valuable enabler of LNG fuel for marine applications with more than 20 LNGPac systems in operation or under construction. By upgrading the system into a more compact and technically advanced version, safety and reliability will be enhanced, while the capital and operating expenditures (CAPEX & OPEX) will be reduced.
Tags:
Wärtsilä Corporation
Comments on this page are closed.