Scandoil  

Eni Norge Receives Consent for Exploration Drilling


Published May 30, 2016
[an error occurred while processing this directive]

Edit page New page Hide edit links

Scarabeo 8
Aurelia prospect exploration drilling is to be performed by Scarabeo 8

The Petroleum Safety Authority, Norway, reports that Eni Norge – operator for production licence 226 in the Barents Sea – has been granted consent for exploration drilling in Aurelia prospect. The well is to be has the designation 7222/1-1.

Water depth at the site is 424 metres. Drilling is estimated to last for 58 days, depending on whether a discovery is made.

Drilling is to be performed by Scarabeo 8 which is a semi-submersible drilling facility of the Moss CS 50 MkII design. The facility is winterised and is designed for working at water depths of between 70 and 3,050 metres.

Tags: Eni Norge AS, Petroleum Safety Authority




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml