Concrete Matresses on back deck of Bibby Polaris
In February 2013, Bibby Offshore was awarded a contract by Premier Oil to provide subsea support during the installation phase of its Solan field development project, in Block 205/26a of the UK Continental Shelf, in 135m water depth.
The facility at the Solan field has been designed to produce a flow rate of 28,000 b/d, peaking at up to 35,000 b/d across a 20-year lifeline.
The production facility has been developed as a not permanently manned installation (NPMI), and will be operated remotely from an onshore control room in Aberdeen. The topsides facility supports produced fluid separation, gas treatment, all necessary utilities and power generation.
The field infrastructure also includes a 10,000-tonne subsea oil storage tank (SOST) capable of storing 300,000 bo. Produced oil is sent to the SOST before being exported, via a single anchor loading system (SAL), to shuttle tankers.
Tags:
Bibby Offshore
Comments on this page are closed.