Scandoil  

ShaMaran provides results of Chiya Khere-6 appraisal well tests


Published Jan 21, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

ShaMaran Petroleum Corp.

ShaMaran Petroleum Corp. provides an operational update on the Chiya Khere-6 well (Atrush Phase 2 area appraisal) in the Kurdistan Region of Iraq.

The Chiya Khere-6 (CK-6) Phase 2 appraisal well was drilled to a total depth of 2,105 metres which was reached on November 5, 2014, after 36 operational days, ahead of plan and budget.

The CK-6 well is located in the eastern part of the structure and was drilled from the same well pad as the Atrush-3 appraisal well (AT-3), the Chamanke-C pad. The well reached the Jurassic reservoir approximately 139 metres structurally higher than the nearby AT-3 well, approximately 600 metres SSE of the surface location.

Tags: ShaMaran Petroleum Corp




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml