ShaMaran Petroleum Corp. provides an operational update on the Chiya Khere-6 well (Atrush Phase 2 area appraisal) in the Kurdistan Region of Iraq.
The Chiya Khere-6 (CK-6) Phase 2 appraisal well was drilled to a total depth of 2,105 metres which was reached on November 5, 2014, after 36 operational days, ahead of plan and budget.
The CK-6 well is located in the eastern part of the structure and was drilled from the same well pad as the Atrush-3 appraisal well (AT-3), the Chamanke-C pad. The well reached the Jurassic reservoir approximately 139 metres structurally higher than the nearby AT-3 well, approximately 600 metres SSE of the surface location.
Tags:
ShaMaran Petroleum Corp
Comments on this page are closed.