Scandoil  

Lukoil completes seismic survey at block 10 in Iraq


Published Feb 20, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

LUKOIL in Iraq

LUKOIL has finished its 2D seismic survey at Block 10 in southern Iraq. The seismic survey began in April 2014 and covered 2,000 linear kilometers. It was completed according to the highest standards six months ahead of schedule. The acquired seismic data will be processed and interpreted to identify promising sites for exploration drilling.

The Mandatory Geologic Exploration Program at Block 10 has a 5-year time frame with a potential 2-year extension and includes drilling one exploration well in addition to the 2D seismic survey.

Block 10 covers a total area of 5,600 square kilometers and is located on the territory of Dhi Qar and Mutanna provinces, 120 km west of Basra. LUKOIL was granted the right to conduct exploration, development and production operations at Block 10 as a result of a licensing round held in June 2012. A 25-year Service Contract with a potential 5-year extension was signed on November 7, 2012.

Tags: Lukoil




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml