Drilling operations designed to expand the number of dewatering wells and ultimately gas production at Selemo is progressing as planned.
At the end of the current program, the Company expects to have at least two new dewatering pods (vertical and lateral production well pairs) that are located on either side of the current Selemo 1P and 1A production pod. A fourth vertical production well will provide flexibility for future expansion.
Tags:
Tlou Energy Limited
Comments on this page are closed.