Oilex Ltd says that since restarting production, the Cambay-77H initial average production rate for 10 days (IP10) was ~71.5boepd. Although demand for gas fluctuates on a regular basis, as anticipated, production from Cambay-77H has gradually increased from 51boepd as previously announced on 7 December 2015.
The well continues producing through a 1/64 inch choke and the average tubing head pressure for the same period was ~2,400psig. The condensate gas ratio (CGR) increased to an average of ~92.5bbls/MMscf from the previously reported 55bbls/MMscf. It is expected that with further production, the CGR may decrease to the anticipated 40-50bbls/MMscf as the tubing head pressure decreases.