Scandoil  

Torchlight Energy re-entered Johnson #4 well


Published Feb 2, 2016
[an error occurred while processing this directive]

Edit page New page Hide edit links

Torchlight Energy Resources, Inc.-2

Torchlight Energy Resources, Inc. says that the Company's Johnson #4 well has been re-entered and drilled laterally to approximately 2500 feet in the Austin Chalk Formation. Subsequently the Company set a liner into place, acidized the well, and has begun swabbing tests.

The swabbing procedures are being performed on an 8-hour basis and have produced increasing fluid entry with 540 Barrels of Oil measured over three recent 8-hour days. After each swab the well has shown excellent gas entry with fluid measuring ~75% to 80% oil cut per run. The fluid level has remained constant at ~800 feet which correlates to excellent entry into the well bore and the shut in tubing pressure is holding at over 470 PSI.

Tags: Torchlight Energy Resources




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml