Scandoil  

Dejour Energy's Mancos discovery at Kokopelli flows over 8 MMCF/D


Published Oct 16, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Dejour Energy - Kokopelli field

Dejour Energy Inc. announced an operational update for its flagship Kokopelli project.

As previously reported, on Kokopelli Pad 21B, Dejour and its operating partner successfully drilled, cased and completed a single vertical 13600' Mancos discovery well (Federal 14-15-7-21) and seven Williams Fork (WF) wells (Federal 14-15-1-21 through Federal 14-15-8-21) as contemplated in the original 2014 drill program. The deep Mancos discovery well completion incorporated 14 stages to best assess the multi-zonal potential of the leasehold.

Immediately upon drilling out the bridge plugs, the Mancos well flowed at over 8 mmcf/d (approximately 1300 BOE/d) with over 4000 psi casing pressure. A historical review of all the vertical Mancos wells in the Basin indicates that the Federal 14-15-7-21 is among the better vertical wells drilled to date. The well has been temporarily choked back to best analyze and align gas composition with current delivery systems. The seven WF wells are now collectively flowing an additional 6mmcf+/d plus liquids with at least 60% of completion fluids yet to be recovered.

Tags: Dejour Energy Inc.




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml