Scandoil  

Petrolia completes Haldimand 4 drilling


Published Jan 7, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Pétrolia-5

Pétrolia says that the drilling phase of the Haldimand 4 well was completed on December 30th. The drilling was conducted within budget and in accordance with engineering projections.

Drilling started on November 25th and was completed in 35 days, which met the predicted schedule. Haldimand 4 is a horizontal well, which was drilled without hydraulic fracturing, and has a total length of 2630 meters. The drilling of the Haldimand 4 well represents an important step in the exploration work necessary to bring this reservoir on production.

At 400 meters, in order to intercept the maximum of natural fractures, the drilling was gradually deviated in a southeast direction until it reached an angle of 78 degrees from vertical.

Tags: Pétrolia




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml