LGO Energy announce that well GY-670 has been successfully drilled to a total depth of 4,300 feet measured depth (MD) and has been electrically logged and cased as a future production well from the C-sand interval. In addition to 206 feet of net oil pay identified on electric logs in the Goudron Sandstone formation and announced on 11 November, a further interval of 242 feet of net oil bearing C-sands have been computed by independent petrophysical analysis performed by LR Senergy.
The net pay in the Gros Morne Sandstone and Lower Cruse, which grade into one another with no defined lithological or pressure differences, have been measured as 242 feet. The previous use of the term C-sands for undifferentiated sands between the pre-Mayaro unconformity (the base Goudron Sands) and the pre-Cruse has therefore been adopted for simplicity.
Tags:
LGO Energy
Comments on this page are closed.