Scandoil  

Noble Energy makes early start-up at Big Bend


Published Oct 30, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Noble Energy, Inc.

Noble Energy, Inc. says that the Big Bend oil development in the deepwater Gulf of Mexico commenced production on October 26, 2015.

The single-well field is ramping as expected and is anticipated to reach a maximum gross production rate of approximately 20 thousand barrels of oil equivalent per day (MBoe/d) over the next couple of weeks.

Approximately 90 percent of the volumes being produced are oil. In addition, the Company has continued to accelerate the Dantzler development and now expects first production from the Dantzler field by early November.

Big Bend and Dantzler, located in Mississippi Canyon 698 and 782, respectively, are subsea tiebacks to the third-party Thunder Hawk production facility. Combined, the fields are estimated to contribute a maximum net production rate of 20 MBoe/d to Noble Energy.

Tags: Noble Energy




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml