Siemens Gamesa company will install 11 of its G114-2.625 MW turbines at the wind facility being developed in Jerez de la Frontera (Cadiz) (photo: Siemens Gamesa)
Siemens Gamesa, Spain’s leading wind turbine OEM, continues to fortify its position in the country having secured a new order for the supply of the turbines for Cepsa’s first ever wind farm, a project with which the Spanish energy player is diversifying its business into the renewables arena.
The wind farm, which is being developed in Jerez de la Frontera (Cadiz), will be equipped with 11 of the firm’s G114-2.625 MW turbines for total capacity of close to 29 MW. Siemens Gamesa has also been engaged to operate and maintain the facility for five years. The wind farm is due to come on-stream towards the end of this year.
Tags:
CEPSA,
Siemens Gamesa Renewable Energy (SGRE)
Comments on this page are closed.